Dataset Viewer
Auto-converted to Parquet Duplicate
corpus_id
stringlengths
27
27
config
stringclasses
1 value
pdf_url
stringlengths
0
271
title
stringlengths
0
275
page
int64
0
3.46k
chunk
int64
0
58
input_text
stringlengths
1
2.89k
has_data_score
float64
0
1
project_id
stringclasses
272 values
doc_id
stringlengths
6
8
document_type
stringclasses
61 values
document_date
timestamp[s]date
1968-09-26 04:00:00
2026-08-14 04:00:00
language
stringclasses
3 values
disclosure_status
stringclasses
2 values
country
stringclasses
3 values
report_no
null
authors
null
disclosure_date
null
major_sector
null
sector
null
topics
null
themes
null
region
null
landing_page_url
null
abstract
null
report_url
null
organization
null
posted
null
originally_published
null
disaster_type
null
entities
listlengths
0
12
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
0
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) EASTERN AND SOUTHERN AFRICA | Ethiopia | Water Glo...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
0
1
(Cost $45.00 M) Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Resilient WASH):(Cost $65.00 M) Institutional Strengthening and Project Management:(Cost $25.00 M) # **Overall Ratings** |Name|Previous Rating|Current Rating| |---|---|---| |Progress towards achievement of PDO|Moderately Satisfactory|...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
1
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) - **Rural WASH:** Encouraging implementation progress was noted, with 1,441 rural water supply schemes (1,324 new, nine expansions, and 117 rehabilitations...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
1
1
56 small towns and eight medium towns (four in Oromia and four in SNNP) to provide access to potable water supply and improved sanitation facilities for 1.07 million and 0.32 million urban people respectively. So far civil works construction has started in six medium towns with different levels of completion: Dilla 39...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
1
2
; (ii) rescoping of proposed investments for the targeted towns to align with available resource and to consider phased implementation that would better align with available funds and towns' short to medium term needs (5-10 years); (iii) for any financing gap beyond the program resources, the regions/towns are required...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
1
3
*Institutional WASH:** In schools, to date: 246 schools have benefited from water supply facilities (157 new and 89 rehabilitated) - 13.3% of the program target; 369 schools have benefited from sanitation facilities and declared ODF, and; 103 new menstrual hygiene management (MHM) facilities have been completed. In th...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
1
4
meeting readiness criteria by woredas and towns, including allocation of matching funds; (vii) security problems in some of the program Regions. There is a need to review implementation modalities (and potential delegation to regions) to ensure closer follow up, engagement with communities and adequately establish WAS...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
2
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) # **Systematic Operations Risk-rating Tool** |Risk Category|Rating at Approval|Previous Rating|Current Rating| |---|---|---|---| |Political and Governa...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
2
1
Custom) ||Baseline<br>Actual(Previous)|Actual(Current)|End Target| |---|---|---|---| |Value|0.00<br>204,083.00|221,921.00|3,012,000.00| |Date|01-Jul-2019<br>14-Mar-2022|30-Nov-2022|30-Jun-2024| |Comments**:**<br>IN01232128|The indicator measures the cumulative number of<br>conditions: • Quality: water supplied shoul...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
2
2
--| |Value<br>0.00|193,972.00|200,666.00|2,015,000.00| |Date<br>01-Jul-2019<br>|14-Mar-2022|30-Nov-2022|30-Jun-2024| |IN01232131<br>Urban (Number, Custom Breakdown)|||| |Baseline|Actual (Previous)|Actual (Current)|End Target| 1/22/2023 Page 3 of 11
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
3
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) |Value<br>0.00|10,111.00|21,255.00|997,000.00| |---|---|---|---| |Date<br>01-Jul-2019<br>|14-Mar-2022|30-Nov-2022|30-Jun-2024| |IN01232134<br>Female (Numb...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
3
1
-Mar-2022|30-Nov-2022|30-Jun-2024| |Comments**:**|This indicator measures the cumulative number of p<br>following criteria: * Accessibility: an improved facility<br>improved facility implies the MoH’s standard definiti<br>emptied, transported, and treated offsite The indicat<br>**The previous ISR figure for this indica...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
3
2
br>|14-Mar-2022|30-Nov-2022|30-Jun-2024| |IN01232129<br>Urban (Number, Custom Breakdown)|||| |Baseline|Actual(Previous)|Actual(Current)|End Target| |Value<br>0.00|1,110.00|28,447.00|442,000.00| |Date<br>01-Jul-2019<br>|14-Mar-2022|30-Nov-2022|30-Jun-2024| |IN01232133<br>Female (Number, Custom Breakdown)|||| |Baseline...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
4
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) # Improved hygiene behaviour and practice <u><mark>IN01232125</mark></u> ►Proportion of kebeles within the Project woredas declared and verified as ope...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
4
1
water schemes that are functional and supply safe drinking water in areas under the Project (Percentage, Custom) ||Baseline|Actual(Previous)|Actual|(Current)|End Target| |---|---|---|---|---|---| |Value|0.00|0.00|0.00||75.00| |Date|01-Jul-2019|30-Sep-2021|30-Nov|-2022|30-Jun-2024| The indicator measures the chang...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
4
2
.00|0.00|75.00| |Date<br>|01-Jul-2019|30-Sep-2021|30-Nov-2022|30-Jun-2024| |IN01232130<br>Urban (Percentage, Cus|tom Breakdown)|||| ||Baseline|Actual(Previous)|Actual(Current)|End Target| |Value|0.00|0.00|0.00|100.00| |Date<br>|01-Jul-2019|30-Sep-2021|30-Nov-2022|30-Jun-2024| |IN01232132<br>►Proportion of urban water|...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
5
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) |Value|0.00<br>0.00|0.00|100.00| |---|---|---|---| |Date|01-Jul-2019<br>30-Sep-2021|30-Nov-2022|30-Jun-2024| |Comments**:**|The indicator is also a proxy i...
1
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[ { "text": "water resource management information system", "label": "DESCRIPTIVE_DATA", "score": 0.5120987296, "start": 707, "end": 751, "provenance": { "producer": "World Bank" }, "usage_impact": { "data_type": "administrative", "usage_action": "analyze", "imp...
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
5
1
-Nov-2022|30-Jun-2024| |Comments**:**|The indicator measu<br>use of the water res<br>management of wat|res accessibility and use of the<br>ource data (meteorology, hydro<br>er supply systems delivered un|water resources monitorin<br>logy and groundwater) to i<br>der the Project.|g system. It measures the<br>nform desig...
1
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[ { "text": "ource data", "label": "VAGUE_DATA", "score": 0.6914246082, "start": 139, "end": 149, "provenance": { "year": "2024" }, "usage_impact": { "data_type": "other", "usage_action": "analyze", "impact_label": "evidence-base", "usage_summary": "Uses w...
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
5
2
. It is<br>s rehabilitation of| |New (Number, Custom Breakdown)| |---| |Baseline|Actual(Previous)|Actual(Current)|End Target| |---|---|---|---| |Value<br>0.00|844.00|1,324.00|6,800.00| |Date<br>01-Jul-2019<br>|14-Mar-2022|30-Nov-2022|30-Jun-2024| |IN01232146<br>Rehabilitation (Number, Custom Breakdown)|||| |Bas...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
6
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) |Date<br>IN01232147|01-Jul-2019|14-Mar-2022<br>30-Nov-2022|30-Jun-2024| |---|---|---|---| |►Percentage of water|supply schemes with regular w<br>Baseline|a...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
6
1
>oundwater levels) is<br>er services.| # <u><mark>IN01232150</mark></u> # ►Number of safely managed latrines constructed under the Project (Number, Custom) ||Baseline<br>Actual(Previous)|Actual(Current)|End Target| |---|---|---|---| |Value|0.00<br>366,402.00|264,174.00|342,000.00| |Date|01-Jul-2019<br>14-Mar-202...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
6
2
><mark>IN01232151</mark></u> ►Sanitation marketing centers established and functional under the Project (Number, Custom) ||Baseline|Actual(Previous)|Actual(Current)|End Target| |---|---|---|---|---| |Value|0.00|137.00|59.00|83.00| |Date|01-Jul-2019|14-Mar-2022|30-Nov-2022|30-Jun-2024| |Comments**:**|The indicator m...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
6
3
.00|100.00|60.00| |Date|01-Jul-2019|14-Mar-2022|30-Nov-2022|30-Jun-2024| |Comments**:**|The indicator meas<br>supply schemes an<br>of WASH status of t<br>provide gender-disa|ures the extent to which WASH<br>d to which they engage in prop<br>heir community and handle O&<br>ggregated information to track|COMs are legally...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
7
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) Proportion of WASHCOMs with at least 50 percent participation of women under the Project (Percentage, Custom Breakdown) ||Baseline|Actual(Previous)|Actu...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
7
1
improved water sources)<br>der the Project. It is measured in|ter available as result of<br>and efficiency (non-reve<br>cubic meters per day (|water supply interventions for<br>nue water reduction) in urban<br>m3/d).| <u><mark>IN01232140</mark></u> ►Percentage of water supply schemes with regular water quality and...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
7
2
. It<br>quarterly) water quality and<br>formation on water quality<br>lows, groundwater levels) is<br>ter services.| ►Number of public/communal latrines constructed/rehabilitated in urban towns under the Project (Number, Custom) ||Baseline|Actual(Previous)|Actual(Current)|End Target| |---|---|---|---|---| |Value|0...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
7
3
urban<br>afe management of excreta<br>d and treated offsite).<br>**s the previous ISR**<br>**s revised to reflect only**| # <u><mark>IN01232148</mark></u> ►Number of fecal sludge management systems constructed and providing service in the towns under the Project (Number, Custom) |Baseline|Actual (Previous)|Actu...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
8
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) |Value|0.00|0.00<br>0.00|20.00| |---|---|---|---| |Date|01-Jul-2019|14-Mar-2022<br>30-Nov-2022|30-Jun-2024| |Comments**:**|The indicator focuse<br>fecal sl...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
8
1
as<br>packages under the<br>are aligned with the<br>disaggregated sub-i|ures the number of schools and<br>Project.The definitions of adva<br>SDGs' and follow the MoE’s a<br>ndicators by schools and healt|health facilities provided w<br>nced WASH package for s<br>nd MoH’s standard. They ar<br>h facilities.|ith full adva...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
8
2
232139</mark></u> ►Drought and flood early warning systems enhanced and operational (Yes/No, Custom) ||Baseline|Actual(Previous)|Actual(Current)|End Target| |---|---|---|---|---| |Value|No|No|No|Yes| |Date|01-Jul-2019|14-Mar-2022|30-Nov-2022|30-Jun-2024| |Comments**:**|The indicator measu<br>The term operationa|res...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
9
0
Implementation Status & Results Report **The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) # <u><mark>IN01232138</mark></u> # ►Sector Management Information System (MIS) operationalized (Yes/No, Custom) ||Baseline|Actual(Previous)|Actual(Curr...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
9
1
Nov-2022|30-Jun-2024| |Comments**:**|This indicator meas<br>timelyand satisfact|ures the percentage of the grie<br>orymanner(maximum of one m|vances registered that are a<br>onth).|ctually addressed in a| # <u><mark>IN01232149</mark></u> ►Percentage of schemes with completed environmental and social screening proc...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
9
2
--|---| |**Disbursem**|**ents (by loan)**||||||||| |Project|Loan/Credit/TF|Status|Currency|Original|Revised|Cancelled|Disbursed|Undisbursed|% Disbursed| |P167794|IDA-64450|Effective|USD|300.00|300.00|0.00|63.09|229.89|22%| |**Key Dates**|**(by loan)**||||||||| |Project|Loan/Credit/TF|Status|Approval Date|Signi|ng Date|...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000000
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000001222342530/pdf/P1677940821a2c06e09c4706b4fd4683c33.pdf
Disclosable Version of the ISR - One WASH?Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH?CWA) - P167794 - Sequence No : 07
10
0
**The World Bank** One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) (P167794) Implementation Status & Results Report # **Restructuring History** There has been no restructuring to date. **Related Project(s)** There are no related projects. 1/22/2023 Page 11 of...
0
P167794
33984543
Implementation Status and Results Report
2023-01-22T05:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
0
0
# **PROCUREMENT PLAN (Textual Part)** **Project information:** **_Ethiopia, Urban Productive Safety Net and Jobs Project (P169943)_** **Project Implementation agency:** **_Ministry of Labor and Social Affairs (MoLSA), Ministry of Urban Development and Construction (MoUDC), Urban Job Creation and Food Security Agenc...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
0
1
tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in **_Section 33(1)(a) from page 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration ...
1
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
1
0
- **_The procurement is open to eligible firms from any country;_** - **_The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance wit...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
0
**PROCUREMENTPLAN Ethiopia : Urban Productive Safety Net and Jobs Project** **<mark>General Information</mark> Country:** Ethiopia **Bank’s Approval Date of the Original Procurement Plan:** 2021-08-27 **Revised Plan Date(s): (comma delineated, leave blank if non** 2022-03-31 **Project ID:** P169943 **GPN Date:** 2020-1...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
1
<br>Issued<br>Proposal Submission<br>Opening / Minutes|/<br>Bid Evaluation Repo<br>and Recommendati<br>for Award|rt<br>on<br>Signed Contract|Contra<br>Comple| |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| |ET-OROMIA-GINCHI-281176-|Exand the Urban Productive|||||||Reuest for||Pendin|Planned<b...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
2
.00<br>g<br>Implementat<br>ion|||2022-03-21|||2022-04-28|2022-05-<br>28| |ET-OROMIA-MATU-281211-<br>CW-RFQ / Procurement of<br>Labor Semi-Skill for the Public<br>Toilet<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limi|ted|Single Stage - One...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
3
270.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-21|||2022-04-27|2022-06-<br>30| |ET-OROMIA-MAKI-281315-<br>CW-RFQ / Procurement of<br>Labor sem-skill for the<br>construction of Public Toilet<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotation...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
4
<br>Pending<br>Implementat<br>ion|||2022-03-23|||2022-05-02|2022-07-<br>01| |ET-OROMIA-AGARO-281316-<br>CW-RFQ / Procurement of<br>Labor sem-skill for the<br>construction of Public Toile<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limi|ted|...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
5
>Implementat<br>ion|||2022-03-16|||2022-04-28|2022-07-<br>01| |ET-OROMIA-NEGELE BORANA-<br>281454-CW-RFQ /<br>Procurement of Labor Sem-<br>skill for the Construction of<br>Fence Construction in Lot-1<br>and Watershed Management<br>work in Lot-2<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
6
<br>Bank-SPD)|4,900.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-23|||2022-05-07|2022-07-<br>06| |ET-OROMIA-BADESA-281556-<br>CW-RFQ / Procurement of<br>Labor sem-skill for the<br>Construction of Public Toile<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
7
)|5,000.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-22|||2022-04-28|2022-07-<br>01| |ET-OROMIA-HARAMAYA-<br>281778-CW-RFQ /<br>Procurement of Labor sem-<br>skill for the Construction of<br>Public Toilet<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
8
>Bank-SPD)|5,050.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-28|||2022-05-12|2022-07-<br>06| |ET-JIMMA-UDHB-281813-<br>CW-RFQ / Procurement of<br>skilled labor for the<br>construction of public toilet<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
9
Bank-SPD)|882.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-22|||2022-05-06|2022-07-<br>05| |ET-OROMIA-GIMBI-282132-<br>CW-RFQ / Procurement of<br>Skilled Labor for the<br>Construction of Public Toilet<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
2
10
3,100.00|0.00<br>Pending<br>Implementat<br>ion|||2022-03-28|||2022-05-09|2022-07-<br>08| Page 1
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
0
|ET-OROMIA-BULE HORA-<br>282198-CW-RFQ /<br>Procurement of Skilled Labor<br>for the construction of Public<br>Toile|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||R<br>Q<br>B|equest for<br>uotations<br>ank-...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
1
<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||R<br>Q<br>B|equest for<br>uotations<br>ank-SPD)|(Non||5,200.00|0.00<br>Pending<br>Implementat<br>ion||||2022-03-28||||2022-05-04||2022-05-<br>10| |ET-OROMIA-NEKEMTE-<br>285186-CW-RFQ /<br>Procuremen...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
2
OTA-<br>285215-CW-RFQ /<br>Procurement of Skill Labor for<br>the construction of Public<br>Toile|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||R<br>Q<br>B|equest for<br>uotations<br>ank-SPD)|(Non||5,800.00...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
3
<br>ion||||2022-03-30||||2022-05-14||2022-07-<br>08| |ET-OROMIA-SHASHAMANE-<br>285256-CW-RFQ /<br>Procurement of Skill Labor for<br>the Construction of Public<br>Toilet|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
4
00|0.00<br>Pending<br>Implementat<br>ion||||2022-03-29||||2022-05-13||2022-07-<br>07| |construction of public Toilet|||||||||||||||||||||||| |**GOODS**<br>Activit Reference No /||||||||||||||Draft Bidd|n||||Bid Evaluation Reort||||| |y .<br>Description|Loan / Credi<br>No.|t<br>Component|Review|Type<br>Method|Market Ap...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
5
Contract Com|pletion|| ||||||||||||||Planned<br>Actual|Planned<br>Actual<br>Planned<br>A|ctua|l<br>Planned<br>Actual|Planned<br>Actua|l<br>Planned<br>Actual|Planned<br>Actual|Planned<br>Act|ual<br>Planned<br>A|ctual|| |ET-OROMIA-248276-GO-<br>RFQ / Procurement of<br>furniture for regional hub and<br>project beneficiary...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
6
One<br>Envelope||231,500.00||0.0|0<br>U<br>Im<br>on|nder<br>plementati<br>||2021-09-10<br>202|1-10|-27<br>2021-09-15||2021-10-15|2021-11-14|2021-12-09|2022-02-07||| |ET-OROMIA-ADAMA-248287-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for<br>Adama City|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
7
Envelope||36,300.00||0.0|0<br>Pe<br>Im<br>on|nding<br>plementati<br>||||2021-09-15||||2021-10-17|2021-11-16||| |ET-OROMIA-JIMA-250081-<br>GO-RFQ / Procurement of<br>Safety Materials for Jima City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Lim...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
8
|2021-09-15||||2021-10-19|2021-11-18||| |ET-OROMIA-SHASHAMANE-<br>248314-GO-RFQ /<br>Procurement of Safety<br>Materials for shashamane City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||73,400.00||0.0|0<br...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
9
IA-BISHOFTU-<br>248321-GO-RFQ /<br>Procurement of Safety<br>Materials for Bishoftu City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||73,700.00|38,0|40.5|9<br>C|ompleted||||2021-09-15<br>2021-10-1|1|||2021...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
3
10
-NEKEMTE-<br>248327-GO-RFQ /<br>procurement of Safety<br>Materials for Nekemte City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope||50,100.00||0.0|0<br>Pe<br>Im<br>on|nding<br>plementati<br>||||2021-09-15|||...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
0
|ET-OROMIA-ASELA-248334-<br>GO-RFQ / Procurement of<br>Safety Materials for Asela City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|44,800.00|0.00<br>Under<br>Implementati<br>on|2021-09-15|2021-10-22|2021-...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
1
|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|35,100.00|0.00<br>Under<br>Implementati<br>on|2021-09-15<br>2021-10-30|2021-10-22|2021-11-21| |ET-OROMIA-SEBETA-248353-<br>GO-RFQ / Procurement of<br>Hand ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
2
>Completed|2021-09-15<br>2021-10-20|2021-10-22<br>2021-11|-19<br>2021-11-21<br>2021-12-22| |ET-OROMIA-BURAYU-<br>248355-GO-RFQ /<br>Procurement of Hand Tools<br>Materials for Burayu City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Sing...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
3
21<br>2021-12-14| |ET-OROMIA-AMBO-248357-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for<br>Ambo City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|74,300.00|8,657.25<br>Completed|2021-09-15<br>2021...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
4
/<br>Procurement of Hand Tools<br>Materials for Arsi Negele City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|7,300.00|9,490.29<br>Completed|2021-09-15<br>2021-11-02|2021-10-22<br>2021-11|-25<br>2021-11-2...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
5
Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|6,200.00|5,142.69<br>Completed|2021-09-15<br>2021-10-15|2021-10-24<br>2021-11|-08<br>2021-11-23<br>2021-12-14| |ET-OROMIA-BATU-248380-<br>GO-RFQ / Procurement of<br>Safety Materials for Ziway Batu<br>City|IDA / D7320|Expand the Urban Productive<br>Sa...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
6
d|2021-09-15<br>2021-11-02|2021-10-22<br>2021-11|-19<br>2021-11-21<br>2021-11-29| |ET-OROMIA-WELISO-248384-<br>GO-RFQ / Procurement of<br>Safety Materials for Weliso<br>City|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
7
11-18<br>2021-11-30| |ET-OROMIA-MEKI-248388-<br>GO-RFQ / Procurement of<br>Safety Materials for Meki City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|43,700.00|36,230.53<br>Completed|2021-09-15<br>2021-10...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
8
br>Materials for Bulehora City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|41,200.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15|2021-10-22|2021-11-21| |ET-OROMIA-BULEHORA-<br>248396-GO-RFQ /<br>Proc...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
4
9
.00<br>Pending<br>Implementati<br>on|2021-09-15|2021-10-19|2021-11-18| |ET-OROMIA-BORENA-<br>248398-GO-RFQ /<br>Procurement of Hand Tools<br>Materials for Negele Borena<br>City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage -...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
0
|ET-OROMIA-CHIRO-248399-<br>GO-RFQ / Procurement of<br>Safety Materials for Chiro City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|40,200.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15<br>2021-10-19|...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
1
D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|38,600.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-GIMBI-248402-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for<...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
2
|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-DEMBIDOLO-<br>248404-GO-RFQ /<br>Procurement of Hand Tools<br>Materials for Dembidolo City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|8,500.00|0.00<br>Pen...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
3
20|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|10,500.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-MATTU-248411-<br>GO-RFQ / Procurement of<br>Safety Materials for Mattu Ci...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
4
-15<br>2021-10-22|2021-11-21| |ET-OROMIA-FICHE-248422-<br>GO-RFQ / Procurement of<br>Safety Materials for Fiche City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|33,500.00|0.00<br>Under<br>Implementati<br>...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
5
Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|33,500.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-AGARO-248431-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for<br>Agar...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
6
09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-HOLETA-<br>248433-GO-RFQ /<br>Procurement of Hand Tools<br>Materials for Holeta City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|22,300.00|0.00<br>Pending<br>Imp...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
7
br>Bedele city|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|8,500.00|3,801.75<br>Completed|2021-09-15<br>2021-10-11<br>2021-10-22<br>2021-1|1-23<br>2021-11-21<br>2021-12-06| |ET-OROMIA-BADESA-248439<br...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
8
>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<br>Envelope|15,800.00|0.00<br>Under<br>Implementati<br>on|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-GINCHI-248442-<br>GO-RFQ / Procurement fo<br>Safety Materials for Ginchi<br>City|<br>IDA / D7320|Expand the Urban Productive<br>Safety Ne...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
5
9
15<br>2021-10-15<br>2021-10-22<br>2021-1|1-08<br>2021-11-21<br>2021-11-26| |ET-OROMIA-YABELO-248448<br>GO-RFQ / Procurement of<br>Safety Materials for Yabello<br>City|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited|Single Stage - One<...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
0
|ET-OROMIA-YABELO-248451-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for<br>Yabello City|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|16,500.00|0.00<br>Pending<br>Implementati<br>on|2021-09-...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
1
459-<br>GO-RFQ / Procurement of<br>Hand Tools Materials for Dera<br>City|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|9,800.00|10,057.92<br>Completed|2021-09-15<br>2021-12-02<br>2021-10-22<br>2021-|12-2...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
2
br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|13,800.00|0.00<br>Pending<br>Implementati<br>on|2021-09-15<br>2021-10-22|2021-11-21| |ET-OROMIA-AMBO-281049-<br>GO-RFQ / Procurement of<br>Seedling|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
3
IA-AMBO-281041-<br>GO-RFQ / Procurement of<br>Local Construction Materials|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|550.00|0.00<br>Pending<br>Implementati<br>on|2022-03-19<br>2022-04-25|2022-05-16| ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
4
942.00|0.00<br>Pending<br>Implementati<br>on|2022-03-26<br>2022-05-02|2022-05-22| |ET-OROMIA-GINCHI-281167-<br>GO-RFQ / Procurement of<br>Industrials Construction<br>Materials|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single S...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
5
Q / Procurement of<br>Seedling|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|6,832.00|0.00<br>Pending<br>Implementati<br>on|2022-04-09<br>2022-05-16|2022-06-05| |ET-OROMIA-SABATA-281182<br>GO-RFQ / ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
6
,910.00|0.00<br>Pending<br>Implementati<br>on|2022-03-20<br>2022-04-26|2022-05-16| |ET-OROMIA-SABATA-281190<br>GO-RFQ / procurement of<br>Tents for a child care center|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
7
IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|7,379.00|0.00<br>Pending<br>Implementati<br>on|2022-03-15<br>2022-04-21|2022-05-21| |ET-OROMIA-MATU-281195-<br>GO-RFQ / Procurement of<br>Block for the const...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
8
|2022-03-26<br>2022-05-02|2022-05-22| |ET-OROMIA-MATU-281200-<br>GO-RFQ / Procurement of<br>Waterline installation<br>/sanitary/ Materials|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment|Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|286.00|0.00<br>Pen...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
6
9
<br>Quotations|Limited<br>Single Stage - One<br>Envelope|1,176.00|0.00<br>Pending<br>Implementati<br>on|2022-04-09<br>2022-05-16|2022-06-05| Page 5
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
0
|ET-OROMIA-CHIRO-281216-<br>GO-RFQ / Procurement of<br>Industrial construction<br>Materials|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|5,000.00|0.00<br>Pending<br>Implementati<br>on|2022-03-15|2022...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
1
D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|2,835.00|0.00<br>Pending<br>Implementati<br>on|2022-03-16|2022-04-22|2022-05-22| |ET-OROMIA-MAKI-281221-<br>GO-RFQ / Procurement of<br>Seedling|IDA / D7320|Exp...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
2
2022-04-21|2022-05-16| |ET-OROMIA-MAKI-281223-<br>GO-RFQ / procurement of<br>Block for the construction of<br>Public Toilet|IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|550.00|0.00<br>Pending<br>Impl...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
3
to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|1,675.00|0.00<br>Pending<br>Implementati<br>on|2022-03-22|2022-04-28|2022-05-23| |ET-OROMIA-YABELO-281295<br>GO-RFQ / Procurement of<br>Seedling|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to ...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
4
|2022-05-21| |ET-OROMIA-YABELO-281297<br>GO-RFQ / Procurement of<br>Block for the construction of<br>Public Toile|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|490.00|0.00<br>Pending<br>Implement...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
5
/ D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|1,503.00|0.00<br>Pending<br>Implementati<br>on|2022-03-26|2022-05-02|2022-06-01| |ET-OROMIA-AGARO-281308-<br>GO-RFQ / Procurement of<br>Seedlig|<br>IDA / D73...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
6
2022-03-19|2022-04-29|2022-05-19| |ET-OROMIA-AGARO-281311-<br>GO-RFQ / Procurement of<br>Block for the construction of<br>Public Toilet|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|571.00|0.00<br...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
7
Q / Procurement of<br>Local Construction Materials|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|2,066.00|0.00<br>Pending<br>Implementati<br>on|2022-03-19|2022-04-25|2022-05-25| |ET-OROMIA-ASALA-2...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
7
8
139.00|0.00<br>Pending<br>Implementati<br>on|2022-04-06|2022-05-16|2022-06-05| |ET-OROMIA-ADAMA-281320-<br>GO-RFQ / Procurement of<br>Tent for childe car center|<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>Post|Request for<br>Quotations|Limited<br>Single Stage - One<b...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
8
0
|ET-OROMIA-ADAMA-281341<br>GO-RFQ / Procurement of<br>Finishing Materials in Lot-1<br>and Waterline installation<br>/sanitary/ Materials in Lot-2|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>P|ost|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|31...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
fcv_pads_east_africa:000001
fcv_pads_east_africa
https://documents.worldbank.org/curated/en/099000003312231804/pdf/P16994306f4a98050081280edef09840773.pdf
Ethiopia - AFRICA EAST- P169943- Urban Productive Safety Net and Jobs Project - Procurement Plan
8
1
ROMIA-NEGELE BORANA<br>281372-GO-RFQ /<br>Procurement of Industrial<br>Construction Materials|-<br>IDA / D7320|Expand the Urban Productive<br>Safety Net to Improve the<br>Urban Environment<br>P|ost|Request for<br>Quotations|Limited<br>Single Stage - One<br>Envelope|13,666.00|0.00<br>Pending<br>Implementati<br>on|2022-0...
0
P169943
33776057
Procurement Plan
2022-03-30T04:00:00
English
Disclosed
Ethiopia
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
[]
End of preview. Expand in Data Studio

fcv-extractions-meta

Data-use mention extractions from the World Bank Fragility, Conflict and Violence (FCV) document corpus, enriched by the fine-tuned rafmacalaba/lfm2.5-350M-datause-multitask model (a LoRA SFT of LiquidAI/LFM2.5-350M).

Shape

nested — one row per chunk; each entity in entities[] carries provenance and usage_impact alongside its span.

Configs

config rows
fcv_pads_east_africa 793,763
jdc_operational 12,372
refugee_pads 45,046
reliefweb 86,178

Fields

  • Document trace: corpus_id, config, pdf_url, title, page, chunk.
  • Mention span: mention (long) or entities[].text (nested), label (NAMED_DATA / DESCRIPTIVE_DATA / VAGUE_DATA), score, start, end.
  • Document metadata (when built with --with-metadata): project_id, doc_id, document_type, country, sector, language, disclosure_status, document_date, region, topics, themes, authors, abstract, and more, joined from rafmacalaba/fcv-corpus.

provenance

producer, year, geography, acronym — verbatim substrings of the source text; keys are omitted when the model finds nothing.

usage_impact

  • data_type: survey, administrative, indicator, database, geospatial, report, other
  • usage_action: source, analyze, curate, validate, inform
  • impact_label: none, evidence-base, policy, uptake
  • usage_summary: one-sentence free text describing how the author uses the data.

Attribution coverage

65,106 of 65,106 extracted entities matched an inference row (100.0%). Entities without a match carry only the raw extraction fields (no provenance / usage_impact).

How it was built

  1. data_use/run.py — GLiNER extraction of data mentions over chunked document pages.
  2. data_use/infer_multitask.py — LFM2.5-350M multitask model predicts provenance + usage/impact per mention.
  3. data_use/attribute.py — joins the inference back onto the extraction chunks on (corpus_id, page, chunk, start, end) and attaches corpus document labels.
Downloads last month
109